In ConnectAll Sync is failing between Jira Epic and ALM Requirement
search cancel

In ConnectAll Sync is failing between Jira Epic and ALM Requirement

book

Article ID: 370808

calendar_today

Updated On:

Products

ConnectALL

Issue/Introduction

Steps to Reproduce: 

  • Create a new automation between Jira Epic and ALM requirement with constant field mapped (Refer snippet)
  • Create a new Epic in Jira and run the sync
  • Checked dashboard on ConnectALL (Prod)

 

Expected Results: 

Requirement should created in ALM without any error

 

Actual Results:

Requirement successfully created in ALM, although below error was reported along with the success, 

 ] ' due to the error com.go2group.connectall.adapter.model.exception.ConnectAllIssueLinkingException: com.go2group.connectall.adapter.model.exception.ConnectAllIssueLinkingException: Invalid linkId received! Id received NULL.

 

Environment

SaaS/OnPrem

Cause

DE94896

Resolution

Fix to be provided in upcoming 3.4.0 patch