Configured projection reports to project metrics for 18 months, enabled for cpu and memory metrics.
However, when running the report, it only goes up to 12 months. Is this a hard limit for metric projections in the report?
DX NetOps CAPM all currently supported releases
When you run a report, you expose baseline metrics using the checkbox in the view editor, then the 3 Projection metrics will be selectable.
However, if you are trying to do on the fly projections in a view, that has its limits.
Need to Enable the Baseline Metrics:
This shows what Baseline/Projection Metrics are available.
Then see what new attributes are added to the metric picker when you try to run the report.