Is there some way behind the scenes to either wipe out the entire timesheet or remove that task without reopening the project?
As of now we do not have a way to remove time from a timesheet if it was added before the project was closed.
Workaround: Reopening the project or deleting the time period.
Also we do not recommend to make any changes directly to the DB..