Schedule/Job is scheduled to start at a specified time.
In order for the Schedule/Job to run at the pre-scheduled time, how should this be configured?
Release: r7.3
Component: SCHDVS
Schedule/Job can be started at a specified time by entering the start time in the EARLIEST START TIME field on the Schedule/Job Definition (Basic Record) screen.
<Note>
It is possible to schedule a Schedule/Job by specifying the time only. The specification of a Schedule/Job to be a predecessor is not a required field. Specify as appropriate.
<For Reference: When creating a schedule that starts at 20:30>
SCHD-SU **SCHEDULE DEFINITION ** CA-SCHEDULER
===> MASTER - WR
CONNECT : 40
SCHEDULE NAME : xxxxxxxx PROTOTYPE SCHEDULE NAME :
SCHED PRIORITY:
AUTO SELECT :
DATETABLE NAME: SKIP :
RUN ON SYSID : BACKLOG : YES
NODE ID : STAGE JCL :
NODE SYSID : USE SIMTIME :
AVERAGE TIME:
USERS:
LIBRARY TYPE :
POWER CLASS :
POWER PRIORITY: POWER USER :
AUTO-REPLY MESSAGES : N
EARLIEST START TIME : 20:30 MAXIMUM EXECUTION TIME :
MUST START BY TIME : COMPLETION DEADLINE TIME :
RECS= SBR: N SCR: N SRC: N SIR: N SMR: N PF1:HELP
After entering the information, press the Enter key to complete the creation of the basic record.