This tool provides you with an impact analysis following the reduction of metrics in various versions of the product as well as with the validation check results of the system's upgrade ability.
If you are currently leveraging any of the discontinued or disabled metrics in your existing content such as reports, alerts, dashboards etc., the VMware Aria Operations (formerly known as vRealize Operations) Pre-Upgrade Readiness Assessment Tool can help you scan your content for these metrics and provide you recommended replacements in form of a pre-upgrade assessment report web page. This web page provides you all the recommended replacements for the content (such as Metrics, Properties, Dashboards, Alerts etc.) which have been discontinued / disabled with VMware Aria Operations 8.12.x. You can use these recommendations to make appropriate changes to the content post upgrade to VMware Aria Operations 8.12.x.
Note: Only vRealize Operations 8.6.x and later can directly upgrade to VMware Aria Operations 8.12.x. However, this Pre-Upgrade Assessment Tool can be run on vRealize Operations 6.2.0 or later.
For others versions of vRealize operations, see vRealize Operations Pre-Upgrade Readiness Assessment Tools (67311).
To find out what user content may be impacted by the metric reduction, run the Pre-Upgrade Readiness Assessment Tool before upgrading to VMware Aria Operations 8.12.x.
Note: Clicking an impacted metric will take you to the VMware Aria Operations Deprecated Metrics and Replacement Recommendations page which will display a replacement metric if applicable.
The content on this page is subject to change.
For more information on metric changes in VMware Aria Operations 8.12.x, see VMware Aria Operations Deprecated Metrics and Replacement Recommendations.
For more information on sizing the VMware Aria Operations cluster, see the VMware Aria Operations Sizing Guidelines.