Problem:
After round trip of a project with Roles ( having 0 ETC) to MSP, if a Role replace is done in CA Clarity PPM after this, the task Dates that this role is assigned to change to the match the project dates. The ETC also changes to the equivalent of the resource's 100% availability
Steps to Reproduce:
Expected Result: The Resource shows as having 0 ETC's on both the Team and the Task properties views. Also, the task dates remain the same as before (11/2/2015-11/6/2015).
Actual Result: The Resource shows in both the Team and Task properties views as having 80 hours of ETC's. The task dates change to match the project dates (10/26/2015 - 11/6/2015, 10 day duration).
Environment:
Applies to CA PPM 14.2, 14.3 using Legacy MSP Driver
Cause:
Caused by CLRT-79199
Resolution:
Issue has been resolved in 14.2.0.11 (14.2 patch 11) and 14.3.0.8 (14.3 patch 8)