Symptoms:
This article contains a list of known issues that are resolved in the latest patch available for vRealize Automation 8.0.1.
Current Patch Version: Patch 5
List of issues resolved in this patch:
See the attached spreadsheet titled: vRA801-P5-ResolvedList.xlsx under the Attachment(s) section for a full list of all resolved issues and their associated Symptom(s).
IMPORTANT:
Following the VMware by Broadcom Day 2 transition on May 6, 2024, Customer Connect has been migrated to the Broadcom Support. This migration impacts the VMware Aria Suite Lifecycle as follows:
All Product Support Packs, along with product and patch binaries, will now need to be downloaded from the Broadcom Support Portal
Users must then manually map these into the VMware Aria Suite Lifecycle
Additionally, all online download methods previously available in the VMware Aria Suite Lifecycle will be disabled in the user interface upon upgrading to our next release.
It is recommended to install vRealize Suite Lifecycle Manager 8.0.1 Patch 1 before vRealize Automation 8.0.1 P5. The vRealize Suite Lifecycle Manager 8.0.1 Patch 1 contains a fix for some intermittent delays in submitting the patch request.
The steps to install vRealize Automation 8.0.1 P5 using vRealize Suite Lifecycle Manager are as follows:
Note: The value provided in the wizard is the total new disk size.
For additional information on troubleshooting upgrades or patch applications see: Work with vRealize Suite Lifecycle Manager Logs
Impact/Risks:
Note: Version 8.0.1 Patch 5 is the last patch that VMware plans to deliver for vRealize Automation 8.0.1. To continue to receive feature updates and resolved issues, it is recommended that you upgrade to the latest version of 8.x. The process to upgrade to the latest version is similar in time and effort to installing the patch.