Link down event not propagated to physical switch for some 10GBASE SFP+ transceiver
book
Article ID: 320921
calendar_today
Updated On:
Products
VMware NSX
Issue/Introduction
Symptoms: When user turns off the laser for 82599-based SFP+ fiber adapters, running the "ifconfig ethX down" command in Linux or the "edge-appctl -t dpd.ctl physical_port/stop fp-ethX" command against the Edge datapath, the link down signal may be not propagated.
Environment
VMware NSX-T
Cause
This issue occurs because the transceiver used is untested and/or unsupported by Intel.