CB Response: Stale Date With Error In Server Communication Status Widget
search cancel

CB Response: Stale Date With Error In Server Communication Status Widget

book

Article ID: 287724

calendar_today

Updated On:

Products

Carbon Black EDR (formerly Cb Response)

Issue/Introduction

  • Under the Server Dashboard > Server Communication Status section, an error code is presented, but the <date> specified is significantly in the past.
Cb Threat Intel enabled but not connected. Error code: <error code> at <date>
  • An OperationalError appears somewhere inside the master server's /var/log/cb/allianceclient/* directory. Look for this error as root by running:
# /var/log/cb/allianceclient/* |grep psycopg2.OperationalError



 

Environment

  • CB Response Server: 6.1.2 - 6.2.3

Cause

Improperly handled exception from postgres DB causes a query failure to not be retried and the underlying thread to terminate. This known issue is tracked as CB-22467.

Resolution

  • Restart the CB Response cluster to immediately address the issue.  

Additional Information

  • This issue is resolved in CB Response 6.2.4.