Policy Execution logic that spans a period of time
search cancel

Policy Execution logic that spans a period of time

book

Article ID: 284460

calendar_today

Updated On:

Products

CloudHealth

Issue/Introduction

This can be confusing so let's analyze the following example:

A sample policy condition is the following:

Total Cost ($) increased by more than 20 % over 7 days.

Resolution

In this example, CloudHealth will evaluate between the last full day of evaluation which is generally 2 days prior to the current date (day X) and 7 days before (day Y).  The platform then checks if there was an increase of 20% or more from day Y to day X.