The following documentation will review the differences in Standard and Advanced perspectives and how to enable each.
Standard Integration
This means the perspective will be available on all non-graphical (OLAP) reporting and will show on tabular reports. If you would like to enable a particular perspective to have "Advanced integration", the available action is to "Enable advanced integration":
Standard Perspective showing tooltip
Advanced Integration
This means the perspective is available in nearly all reports (OLAP and tabular). Note that there is a limit of 6 perspectives that can be configured as "Advanced integration" at any given time. If you would like to downgrade a perspective back to "Standard integration", the available action is to "Disable advanced integration":
Tooltip for advanced integration.
Advanced Integration in progress
Advanced Perspectives will be updated one or more times daily to refresh the assets within the perspective. During this time, the status will be displayed as follows: