With specific settings week 1 is not correctly identified in 2024 and 2029.
This happens in 2024 and 2029 when the first day of the year is a Monday and with the following settings in UC_CLIENT_SETTINGS:
With those settings, CW=1 does not exist in AWI.
For instance, if you create a weekly calendar set to every 2nd Wednesday, the first event is on the 10th of January instead of the 3rd.
If you create a weekly calendar with every 4th, which starts in week CW=11, the first event is in week 12
As a consequence, a run can be missed at the beginning of the year.
This is a defect
Solution:
Update to a fix version listed below or a newer version if available.
Fix version:
Component(s): Automation Engine
Automation.Engine 21.0.10 - Available
Automation.Engine 24.1.0 - Available
The reference for this fix is AE-35832