From the MUX, when accessing the "Tasks" icon, and attempting to filter, all Projects display, even if the Tasks have been filtered out.
Steps to Reproduce:
1. Log into MUX, on the left side go to "Tasks"
2. Add a Filter for a field, which should exclude some Projects.
Expected Results:
The tasks that passed the filter should be seen under the expanded investment
Actual Results:
The tasks appear at the bottom of the investment list
Workaround:
None
DE79669
This is resolved in 16.2.2.