JOBF sporadically remains in connecting status when transferring files from Linux (Redhat9) to Windows server with the errors as below:
U00063094 FT Process 'filetransfer-src-with PID='12345' was initiated.
U00063083 FT Process with PID='12345' ended before the transfer was completed with the return value '11,status=139'.
U00063094 FT Process 'filetransfer-src- with PID='12345' was initiated.
U00063083 FT : Process with PID='12345' ended before the transfer was completed with the return value '16,status=4096'.
RedHat Linux 9
21.0.7
Known defect
This issue is fixed in version 21.0.9 which is currently GA and can be downloaded from downloads.automic.com.