ConnectALL syncs only 1 value if more than 1 sprint value given in the Jira Sprint field(both on-prem Jira)
Fields mapped :
Jira Sprint <> Jira Sprint
Steps to reproduce :
Expected Results: Both sprint values should sync.
Actual Results: The first value in the sprint field was getting synced but the second value is getting ignored.
2.10.28 - 3.1.x
DE72178
DE72178 is addressed in 3.2.0 version