Following the refresh operation, I would like to prevent production jobs contained in the CA7 queues to run on the test LPAR.
What is the best practice to take?
Release: r12.1
Here is the best practice to take.
1- Modify the RUNOPT parameter of the ONLINE member: change RUNOPT=(SCAN) to RUNOPT=(NSTA).
2- Code STOPQ=YES on the SCHEDULE statement
3- Start the STC CA7 with TYPE=COLD:
Reply OK to message CA-7.905
Reply NOSCAN to message CA-7.973