Capacity, Cost Total and other values recalculated when the project dates are changed on a roadmap
STEPS TO REPRODUCE
Expected Results: The behavior should be the same in both cases when the project fits completely on the roadmap or when it only fits partially
Actual results: If the project fits fully on the roadmap the original value is spread on existing periods. If the project does not fully fit, the values are recalculated.
When using 'Sum of Periods' the values are recalculated based on the selected period duration of the View Options, which defaults to the Roadmap duration.
Use the 'Grand Totals' instead so the values are not recalculated