Simulated Jobstream run drops from monitoring tab after putting an upstream job On Hold via simulation instead of the jobstream run going into an NPTF status with a root cause of "On Hold"
Release : 6.4.5
Defect DE560000 has been created for this problem.
The expectation is that a Simulated Jobstream run should show up as an NPTF Simulated Jobstream run when this is resolved.