Is it possible to attach documents in a Task Timeline view?
Clarity PPM 16.x
It is currently not possible to add fields of type attachment to the Timeline View.
Those fields of Data Type attachment can be added as a field in the Grid View.
It is also possible to add the field to the Details fly-out.