The Post To WIP job has been giving error.
REVMGR-20100: Unable to obtain currency exchange information
Release : 16.0.2
1. Check the number of transactions total that need to be posted.
2. Identify the project(s) with an invalid currency entered.
3. Verify that the project currency, resource currency and system currency are all defined.
4. Verify the transactions have both the To and From Exchange rates defined.
ttran_0404223 - created per 33403156