SUMMARY:
Task Duration is not updated consistently on the Details flyout.
Steps to Reproduce:
1. Open a Project and select the Task module.
2. Select the Timeline or Grid view.
3. Add a new task or select an existing one.
4. Select the Task, click on Details to bring up the Details flyout.
5. Add the Duration field to the Details if not present (Configure).
6. Change the Finish Date of the task on the Details flyout.
Expected Results: The Duration of the task is modified according to the new Finish Date.
Actual Results: The Duration of the task is not modified on the Details flyout.
Release : 16.0.2, 16.1.1
This has been reviewed as DE68934.
This is determinted to be duplicate of DE68710.
In 16.1.1, Auto Refresh in MUX is not working for attributes which are not Read Only.
This has been reviewed as DE68934.
This is determinted to be duplicate of DE68710.
Resolved in 16.1.1(patch1) and 16.1.2
In 16.1.1, Auto Refresh in MUX is not working for attributes which are not Read Only.
Workaround: Refresh the view or Change the Finish Date of the task on the Timeline or Grid column.