In the Status Reports of the Modern UX, is it possible to include calculated fields that derive their value from Risks and Issues of that project instance? These calculated fields must incorporate a set of rules that define their output.
Attributes of data type "Calculated", in the Status Report object, cannot be used to derive inputs from either the Risk or Issue object.
It is however possible to create an attribute of data type Lookup, or String, whose value is set by a custom Gel script. The script would have to be used to incorporate the set of rules that would define the value of the attribute on the Status Reports object.