Upgrading DB2 version 12 to 13 and z/OS 2.3 to 2.5. Is reassembly of [email protected] and [email protected] required for these upgrades?
Release : 16.0
Reassembly of exits [email protected] and [email protected] is required when there are any changes made to the exit code. However, link-edit of these exits is required for these upgrades.