The 'Assigned Resources' field on the Details Flyout tab in the Tasks Module is not working correctly. It is not reflecting the correct list of actual assignments for this task when the assignees are added to this field in the Details subtab. When an assignee is added into the 'Assigned Resources' field in the grid column, you can see it in the details subtab, but if you add an assignee in the subtab, the grid is not immediately refreshed. Also, after adding the assignees in both places and then deleting all the assigned resources through the Assignments module, when you return to the Tasks grid, the details subtab 'Assigned Resources' is still showing at least 1 resource still selected even though there are no current assignments on the task.
Steps to Reproduce:
Expected Results: The Task 'Assigned Resources' field in the Details subtab should show the same list of resources as what is seen in the Tasks Grid column and Assignments Module Grid.
Actual Results: The Task 'Assigned Resources' field in the Details subtab is not working when the user adds assignees to this field.
Workaround: Add assignees through the Tasks GRID 'Assigned Resources' column or use the Assignments Module Grid.
Release 16.1.1
DE68397
Targeted Fix in Release 16.1.2