Sometimes Load Data Warehouse - Incremental Job takes more than 240 min, it keeps on running. We want to cancel the job and run a Full Load. Should we allow more time for the job to process?
Resolution
It is not recommended to cancel the Load DWH job
The timeout set in the system is 600 minutes.
Even if the job is slow please let it complete fully as cancelling the job from UI will not remove the queries on the database level, which can in turn slow things down or cause locks