Error Messages:
System: ARxxxx04
Queue . . . . . : ARxxxxLAZ Program . . . . : *DSPMSG
Library . . . : QUSRSYS Library . . . :
Severity . . . : 00 Delivery . . . : *NOTIFY
Type reply (if required), press Enter.
Object ABC03ACB code CBL compiled successfully.
End of Compile for environment AIPRDARG on request AD09.
Start of Compile for environment AIPRDARGR on request AD09.
Object ABxxxxCB code CBL compiled successfully.
End of Compile for environment AIPRDARGR on request AD09.
Start of Move to local environment AIPRDARG request AD09.
Mbr/obj ABxxxxACB code CBL promoted to lib AIARGOP in env AIPRDARG.
End of Move to Local environment AIPRDARG request AD09.
Start of Distribution to sys SAxxxx01 for env AIPRDARGR rqs AD09.
Restore of items failed for request AD09, environment AIPRDARGR, on system
SAxxxx01.
Abnormal end of Dist to system SA00AR01 for env AIPRDARGR request AD09.
Job 022630/ARITEVELAZ/MOVRQSAD09 ended abnormally.
Bottom
Release : 8.7
Component :
Has there been an OS upgrade on either the host or remote recently?
Indeed. The host at IBM was upgraded to V7R3M0.
The configurations looks like this:
Current/ live configuration at Avon:
AR01AS03 host V7R1M0
SA00AR01 receiver V7R1M0
Testing configuration at IBM:
ARxxxx04 host V7R3M0 clone of ARxxxS03
SAxxx01 receiver V7R1M0 clone of SAxxxx01
Step 1.
1. Option 46. Network Configuration from main menu
2. Select host entry with option 2
3. Change Target release parameter to lowest OS for host and all receivers
4. Verify all receivers for this host are at same lowest level
5. Can be changed back to *CURRENT when all systems are upgraded to same OS level
You will need to delete this request and create a new request.
Step 2.
Change the data area IMMULTRQS to *YES
Go into menu option #3-Create Request
F11 to copy a request
1-Select request AD09
Enter, you may need to F9
Check in #12-Request inquiry for your request
If it is in Compile pend – you can submit it in menu option #4
If it is Move-Pend, menu option #5 can be used to submit
If the request is successful, change the IMMULTRQS data area back to *NO