Issue/Introduction

With the application of PTFs SO13759 and LU01692, do both the CEMDCPLN and CEM0167C configuration jobs (as defined in their respective Holddata) need to be run?

 

Environment

Release : 6.0

Component : COMPLIANCE EVENT MANAGER

Cause

Question

Resolution

The CEMDCPLN member (introduced via the ptf LU01692) addresses the CEM Datacom Monitor plan. The SO13759 ptf which is a pre-req to LU01692 introduces the CEME0167C job that addresses both the CEM Datacom Monitor and CEM Warehouse plans.  So, both the CEMDCPLN and CEME0167C jobs need to be run.