search cancel

TMA-0906 error submitting timesheet where DOH falls in

book

Article ID: 243480

calendar_today

Updated On:

Products

Clarity PPM On Premise Clarity PPM SaaS

Issue/Introduction

Since upgrading to 16.0.1 we face a new issue in classic UI timesheets.

When a resource hire date is in the middle of a timesheet week period he cannot enter time. The user gets a TMA-0906 error:

TMA-0906: Resource ID Last name, name starts on x/x/xx. Creating a timesheet requires an existing, active, resource who is open for time entry and has a time track mode set

Resolution

This is working as design.

The message was introduced in 15.9.1

As part of the bug fix, the system is throwing the below error when the hire date is in-between the current week and the user tries to enter the value in the TOTAL column for the selected week

Able to post timesheets with time prior to the DOH (Date of Hire)