After upgrading to v20
When running a log analyzer batch interface job, the Date qualifier is wrong. The Century selection changes.
With v19 D%DATE format is D2220501 so century is 2.
In v20 D%DATE format is D1220501 so century is 1.
Release : 20.0
Component : Log Analyzer for DB2 for z/OS
R19 was producing a wrong date.
The format of Date is
CYYMMDD
so
century yy mm dd
century was being set to 2 so twenty second century
which was wrong.
R20 ptf SO14827 sets the century correctly
it is now set correctly to a 1
so twenty first century which is correct.