Post Timesheets job - Is it possible to post future timesheets only for a specific month
book
Article ID: 240469
calendar_today
Updated On:
Products
Clarity PPM On Premise
Clarity PPM SaaS
Issue/Introduction
Is it possible to configure the product in such a way that:
- It allows posting of future timesheets (AND)
- Does so, only for the current month, ignoring other months in the future
Resolution
It is not possible to configure the Post Timesheets job in this fashion.
Feedback
thumb_up
Yes
thumb_down
No