Hierarchy Timeline Smart Periods do not work correctly if Fiscal Periods do not exist for the current period/year in the Default Entity.
STEPS TO REPRODUCE:
Expected Results: Toast error message Fiscal periods of the requested period type for the plan duration do not exist is displayed as you see in modules such as Assignments.
Actual Results: No error message is displayed, and the periods for 2017 are displayed (which is not expected for the period selected).
Release: Clarity 16.0
Component: Hierarchies
DE63036
Fixed in 16.0.1
Workaround: Create appropriate fiscal periods within the Default Entity. The periods do NOT have to be active for them to appear.