Classic TSV is not using Date constraints

book

Article ID: 221932

calendar_today

Updated On:

Products

Clarity PPM On Premise Clarity PPM SaaS

Issue/Introduction

Classic Time Scale Value (TSV) is not using Date Constraints when there is another TSV without Date Constraints in the same configuration

STEPS TO REPRODUCE: 

  1. Create 2 attributes on the Project object with the following properties:
    • Attribute Name: TSV Money Dates 
      • Data Type: Time-varying
      • Time-varying Type: Calendared
      • Time-varying Data Units: Money
      • Currency Code Location: Reference another attribute of this object - Currency Code 
      • Time-varying Date Constraints:
        • Start On: Start
        • Finish On: Finish
    • Attribute Name: TSV Money
      • Data Type: Time-varying
      • Time-varying Type: Calendared
      • Time-varying Data Units: Money
      • Currency Code Location: Reference another attribute of this object - Currency Code
      • Time-varying Date Constraints: *Do not fill out*
  2. In Classic, configure the Project List View to have ONLY the 'TSV Money Dates' configured for 6 months from July 2021 - Dec 2021 - Allow the TSV Field to be Editable
  3. Configure the Project List View to show the Project Start and Finish Dates 
  4. In the Project List View, show some projects that Finish BEFORE July 2021
  5. Try to edit the TSV cells on the row for this project in some periods that are outside of the project start / finish dates. The Classic grid does not allow you to do this as expected because the TSV is configured with the Date Constraints from the Project Start / Finish dates
  6. Go back to the Project List View Configuration and add the 'TSV Money' field so that BOTH TSV fields are shown on the Classic view
  7. Try to edit BOTH TSV rows for the same project that finishes BEFORE July 2021 

Expected Results: The Classic TSV grid should NOT allow the user to edit the TSV Cells for the TSV field that has date constraints. 

Actual Results: The Classic TSV grid is allowing the user to edit the cells for the TSV field that has date constraints in periods that are outside of the date range. 

Cause

Caused by DE62205

Environment

Release : 15.9.3

Component : CLARITY PROJECT MANAGEMENT

Resolution

This issue is under review by Sustaining Engineering

Workaround: Only configure TSV fields that have the same configuration with Date Constraints.