Steps to Reproduce:
- Create an OData interface for the environment.
- Create a process on the Status Report object, that updates the Project Overall Status when the report is Final.
- On the Project object, create an object based multi-valued lookup and add it to the DWH.
- Update the Project instance with a value in the MVL field you created.
- On the same Project instance, create a Status Report instance.
- Run the DWH Incremental job.
- When the job is completed, validate you can see the Project Instance MVL value and the Status Report instance information in the OData V4 interface.
- Run the DWH Incremental job again.
- While the DHW Incremental job is running, edit the Status Report instance and Save the edits.
- When the job is completed, validate you can see the Project Instance MVL value and the Status Report instance information in the OData V4 interface.
Expected Results:
- DWH contains the Project Instance information with the MVL field value.
- DWH contains the Status Report Instance information.
Actual Results:
- DWH contains the Project Instance information, but NOT the MVL field value.
- DWH contains the Status Report instance information.
Environment
Release : 15.9.1
Component : CA PPM SAAS DATA WAREHOUSE
Resolution
DE60023
Resolved in 15.9.2