STEPS TO REPRODUCE:
1. Create an Entity with time periods. There are 12 monthly periods, some are more than 30 days and some less.
2. Create A Roadmap, and associate Projects to the Roadmap.
3. Access Advanced Reporting, and run the Roadmap Timeline report. Populate the designed Options, and run the report.
Expected Results:
The twelve monthly periods should display in order
Actual Results:
Some of the monthly time periods are duplicated in the report, so all twelve do not display
Workaround:
None
Release : 15.9
Component : CA PPM JASPERSOFT
The fix for this issue is included in Clarity 16.0, and is associated with defect DE61135.