Issue/Introduction

When editing tasks in OWB, some of the rows might shrink after the edit and after selecting one of those tasks, multiple tasks will be selected at once.

Steps to Reproduce:

  1. Open OWB with a blank project
  2. Create multiple tasks (e.g.: 20 tasks). Just filling the name is sufficient.
  3. Move to a task (e.g.: 5th task) and click on 'Name' field.
  4. Press ESC key from the keyboard. The row height will now be less than before.
  5. Repeat step 4 with multiple tasks below.
  6. Click on any of these tasks that have less height to select it.

Expected Results: Tasks should not reduce its height. On clicking one to select, only one task should be selected.
Actual Results: Tasks have two different heights. On clicking one to select, multiple (normally 2-3) tasks are selected. Row height is normalized.

Cause

This issue has been reported to Engineering as DE59719.

Environment

This issue has been reported for OWB for Clarity 15.6.0.

Resolution