The timesheet gauge ignores the resource DOH (Date of Hire) or DOT (date of Termination)
Steps to Reproduce:
1. Create a user ResA with all rights
2. At the Home > Resources side, edit the resource above
3. Set the date of Hire as 12/4/20 (December the 4th)
4. Ensure the Track Mode is set to PPM and is Open for Time entry
5. Create a project that spans from 11/1/20 till 12/31/20
6. Add ResA as team member
7. Log in as ResA to the Modern UX
8. Go to the Modern UX > Timesheets
9. Go to the Nov 30-Dec 6 timesheet
Expected Results: Timesheet gauge to display 8 Hours of availability 00.00/08.00
Actual Results: Timesheet gauge displays 40 Hours of availability 00.00/40.00
This is caused by DE59199
This is targeted to be fixed in 15.9.2 and backported to 15.9.1.1
Same scenario applies to the Resource DOT (Date of Termination)