TMA-0906 Modern UX timesheet error remains long time on the screen
book
Article ID: 205695
calendar_today
Updated On:
Products
Clarity PPM On PremiseClarity PPM SaaS
Issue/Introduction
When time is entered prior to the Date of Hire (DOH) or Before the Date of Termination (DOT), the error message sticks on the screen for a long time
STEPS TO REPRODUCE:
Create a user ResA with all rights
At the Home > Resources side, edit the resource above
Set the date of Hire as 12/4/20 (December the 4th)
Ensure the Track Mode is set to PPM and is Open for Time entry
Create a project that spans from 11/1/20 till 12/31/20
Add ResA as team member
Log in as ResA to the Modern UX
Go to the Modern UX > Timesheets
Go to the Nov 30-Dec 6 timesheet
Create a timesheet. Try to enter time on any day prior to the DOH set (enter time on multiple cells)
You get an error: TMA-0906: Resource ID ResA, ResA starts on 12/4/20. Creating a timesheet requires an existing, active, resource who is open for time entry and has a time track mode set.
Navigate across periods, Go to the projects menu and back, Navigate across the application
Expected Results: The error message to dissapear as I am out of the timesheet where the DOH is hit Actual Results: The error message remains on the screen as you navigate. Eventually goes away. At times you might need to log out.