Pause all Scheduled and Waiting jobs. Allow processing jobs to complete (especially checking for the Time Slicing job which runs frequently), then pause those scheduled instances as well.
If you have any PMO Accelerator reports scheduled via Clarity Reports and Jobs, it's recommended to XOG these out as they may get cancelled as part of the upgrade. You can then XOG them back in post upgrade. See Jasper Reports cancelled after upgrade for more details and to track the status of the related defect.
Complete in flight processes and put all processes on hold.
If you are Clarity SaaS Customer and doing validation testing for the upgrade, you must have access to the CLARITY SAAS - Service Status. to view the status of your upgrade.
This page will be updated once your upgrade is completed. Review the FAQs at Upgrade Schedule for Clarity SaaSpage for more details.
IMPORTANT: Review SaaS communications sent prior to upgrade for any changes to be aware of that may need to be done post upgrade. If these steps aren't completed, it can cause issues within the application post upgrade.
If you are SaaS Customer and want to review the status of your upgrade, please subscribe to CLARITY SAAS - Service Status which will be updated once the upgrade is completed.
Please do not open a case to check on the status of the upgrade.
Allow 24 hours for the upgrade to complete.
Even if the application is up, there may be post upgrade steps being completed. It's important to wait until the notification from the Status page that the upgrade is complete, prior to doing any post upgrade validation.
Post Upgrade
Jobs:
Resume all paused jobs
If there any jobs that were in processing status at the time of the upgrade, please cancel the job, delete the instance and reschedule.
Check for any scheduled jobs that may have gotten cancelled. If yes, reschedule these. This includes processes that use these jobs in action steps.
Check for any jobs that were scheduled to run during the upgrade that may be required to be manually run in order to see reporting data if the scheduled time frame is past. Example: Job was scheduled for 12/14/20 at 3 am ET, and upgrade completed at 12/14/20 at 5am ET. The job would need to be manually run if needed for data.
Run the Load Data Warehouse (DWH) job in full mode.
Run the "Restore Domains" job to update Jaspersoft Advanced Reporting domains with any custom attributes.
Check to make sure the upgrade has fully completed prior to doing any testing. If a job is failing, you can't access the system, reports aren't showing data, etc. it may be because the system is not fully ready
Update Client Applications - If using XOG, MSP, or OWB, make sure that these are upgraded to the latest version of Clarity (Make sure to test this first as part of your non production upgrade testing). Review the Client-Side Components under Hardware and Software Compatibility Specifications for each release. Example 15.9 Client-Side Components