Our user wants some JOBs to continue running for as long as possible.
How can I tell how long a job can be kept in ESP running? Is there a limit and what are the down side of this?
Release: ALL
Component: ESP WORKLOAD AUTOMATION
There is no set limit. If only the ESP files especially APPLFILE and TRAKFILE have enough space, it can stay as long as required.