Our user wants some JOBs to continue running for as long as possible.
How can I tell how long a job can be kept in ESP running? Is there a limit and what are the down side of this?
Release : 11.4 & 12.0
Component : CA ESP WORKLOAD AUTOMATION
If only the ESP files especially APPLFILE and TRAKFILE have enough space, it can stay as long as required.