Copy Cost Plan of Record Charge Code with Cost Type job does not copy the Budget Plan

book

Article ID: 19472

calendar_today

Updated On:

Products

CLARITY PPM FOR ITG CLARITY PPM FEDERAL Clarity PPM SaaS - Application Clarity PPM On Premise

Issue/Introduction

Description:

The copy cost plan job copies only cost plan and adds COST TYPE as grouping attribute to it only if charge code is one of the existing grouping attributes. However, it does not copy the budget plan. It should copy the latest approved budget plan and add COST TYPE as grouping attribute to it only if charge code is one of the existing grouping attributes.

Steps to Reproduce:

  1. Perform an Upgrade to CA Clarity PPM 13.2
  2. Execute the 'Copy Cost Plan of Record Charge Code with Cost Type' job
  3. After successful completion of the job, go to the Project Financial Plans and verify changes

Expected Result: The Cost Plan and Budget Plan (both) should now have a new copy with Cost Type
Actual Result: The Cost Plan POR has a new plan, but the current Budget Plan does not have a new plan copied

 

Solution:

WORKAROUND:
None.

STATUS/RESOLUTION:

CLRT-73607
Resolved in CA Clarity PPM 13.2 Generic Patch. Reference TEC599354
Resolved in CA Clarity PPM 13.3 Generic Patch. Reference TEC605767
Resolved in CA PPM 14.1  

Environment

Release: ESPCLA99000-13.2-Clarity-Extended Support Plus
Component: