If the ETC gets down to zero (from Actuals posted), then ETC totals column can not be updated in Assignments module
STEPS TO REPRODUCE:
Prereqs
Project open for time using a blueprint with the Assignments module.
Resources added to Project Open for time
Tasks added to Project Open for time
Total ETC column in Assignments module
1. In Project add 8 ETC in the ETC Total column to the assignment
2. Create Timesheet and add 8 to the tasks assigned
3. Submit, Approve and Post timesheet
4. Go back to Project>>Assignments and see ETC Total column is 0
5. Try to update ETC Total column.
Expected Results - ETC updates
Actual results - You are able to enter in ETC but when tabbing out, the number is removed.
Release : 15.8, 15.8.1
Component : CA PPM PROJECT MANAGEMENT
DE55743
This is NOT reproduced in 15.9
Configured the TSV 'Total ETC' and Period ETC fields on the ASSIGNMENTS Module. The 'Total ETC' amount could be updated.