Can you have two rollup strategies for one metric (avg and sum) in CA Performance Management
book
Article ID: 189401
calendar_today
Updated On:
Products
CA Infrastructure ManagementCA Performance Management - Usage and AdministrationDX NetOps
Issue/Introduction
Can you have two rollup strategies for one metric (avg and sum) in CA Performance Management
Environment
Release : 3.7
Component : IM Reporting / Admin / Configuration
Resolution
No there can only be one rollup strategy per metric, and it needs to correspond to the metric type:
RollupStrategy
Specifies the operation that is performed every cycle during the rollup of the individually polled values. When Polled and IsDbColumn are set to true, this element is required.
Possible values: Sum (a summation for counters), Avg (an average for gauges) Effect of updating: The specified strategy is used to perform rollup calculations. When does the update take effect: Next poll