The client performed the View 14.0 Installation steps out of order, where a receive of HOLDDATA was done before the base function ACCEPT was done.
The base function ACCEPT fails with:
The ACCEPT of the base functions completes with RC=04 by using:
BYPASS(HOLDERROR(CC00179))
Is using the BYPASS above for the base function ACCEPT acceptable to do?
Will doing that cause any issues down the road?
Release : 14.0
Component : CA View