There are 2 options to copy datapool from one project to other projects
Option1:
***********
Use copy data of remote repository to copy registered tables with in data pool and copy workflows to copy workflow details from one pool to other pool of different project
Option 2:
***********
If you copy the data set, it will copy entire data pool along with data set to other project.