This document describes the process by which a Messaging Gateway (SMG) control center may be migrated to updated hardware or from hardware to VM or to infrastructure in a new DMZ or network.
While the new control center will have the needed configuration to connect to and manage any existing scanners, the scanners will need to be configured to trust the new control center host. For each scanner, perform the following:
agent-config --add [new IP]
agent-config --del [old control center IP]
If the control center also has the scanner components installed:
Messaging Gateway message audit logs are not included in a Full Backup
Some settings will not be overwritten by restoring the backup from the original control center:
Settings that are preserved when restoring from backup Messaging Gateway