Generate reports from Report Scheduler for a specified period

book

Article ID: 16000

calendar_today

Updated On:

Products

DX Infrastructure Management NIMSOFT PROBES

Issue/Introduction



In report scheduler I wish to generate a report for a defined period. I can only see the options like last month, last 3 months.

Is this possible?

Environment

Release: CNMSPP99000-8.51-Unified Infrastructure Mgmt-Server Pack-- On Prem
Component:

Resolution

With the current design it is not possible to specify a specific period for the report.