Need to merge two instances of Endevor - ENDV1 and ENDV2, and each instances has a separate Packages file.
PRIOR TO BEGINNING THIS PROCESS PLEASE OPEN A CASE WITH THE BROADCOM SUPPORT TEAM
Note: No new packages can be created and no packages can be executed until the merger of the two Endevor sites has been completed.
Most important - always make sure to backup both of the Package files before starting
1 - Clean up both Package files by using the Archive Package action with the option to delete.
2 - Backup both Package files.
3 - Create a new Package file by using the BC1JJB05 job found in the ENDEVOR.CSIQJCL library
4 - Run the Package unload job BC1JUNLD found in the ENDEVOR.CSIQJCL library on each of the two current Endevor systems with SCL:
UNLOAD PACKAGE TO DDN UNLODPKG
5 - Run the Package reload job BC1JRELD found in the ENDEVOR.CSIQJCL library using the C1DEFLTS pointing to the new Package file defined in Step 3 with SCL:
RELOAD PACKAGE FROM DDN UNLODPKG
6 - Run the Package Summary report CONRPT70 to validate file is operational