We have an application that is staged in two different instances of CAWLA, and they applications are identical. The events are also identical. Recently a 2nd calendar was added to the events, and they are in the same order. In production (R12.0.02 b. 1075) the special days defined in Cal 1 are not being recognized. In test, (R12.2.00 b. 2344) they are being recognized.
Is this because the calendar with the special days in listed first and then a 2nd calendar is defined, which is possibly overriding the 1st?
Release : 12.0
Component : CA WORKLOAD AUTOMATION DE (DSERIES)
Problem Record: DSRIES-294