Once NF8A90 occurred on the environment, the NetMaster (SOLVE) SSI region was restarted--per automation. Help
was needed investigating it.
OS : z/OS
-
NF8A90 occurred because there was not enough CPU on the LPAR where NetMaster (SOLVE) SSI region was
running--combined with the fact that TCP/IP had a higher dispatching priority (DP) than the NetMaster (SOLVE)
SSI region.
-
The NetMaster (SOLVE) SSI region has to have the same DP as the stack or it will not be able to keep up
with the flow of packets.
-
It follows the location of NF8A90 on NM 12.2 Tech Docs: NF8A90